Series 25239
Department of Transportation. Communications Division Official photographs: video documentation of construction projects
Dates: 1981-
17.60 cubic feet
These records are housed in the Utah State Archives' permanent storage room.
Scope and Content
The Utah Department of Transportation (UDOT) documents highway construction projects. In addition to still photographs, UDOT photographic services created video documentation from 1985 to 1992. These videos include footage of construction processes. They also document construction progress by driving with a camcorder through the entire length of a project at different time intervals.
This series documents many interstate freeway construction projects, including projects on I-15, I-215, I-70, and I-80. Through most of the period of documentation UDOT continued work on I-70 which connects Los Angeles to Denver and passes through scenic but desolate areas of central Utah. I-70 was completed as a two lane interstate in 1970, but thereafter Congress increased interstate standards, making four lanes a requirement. I-70 construction projects in the 1980s involved widening I-70 to bring it up to this four lane standard. UDOT pushed construction through Clear Creek Canyon and Richfield (1986),and then continued on to Green River in approximately ten mile stretches through the heart of San Rafael Swell. Construction mileposts include Fremont Junction, Muddy Creek, Devils Canyon, Ghost Rocks, Rattlesnake Bench and Saleratus Wash. I-70 construction includes passage through Spotted Wolf Canyon, where UDOT expanded a natural gorge a few feet wide to accommodate the four lane interstate. UDOT received national recognition for its construction of the Eagle Canyon Bridge which carried I-70 across Eagle Canyon. This series documents bridge construction and also includes footage of a 4wd trail which descends to the bottom of Eagle Canyon.
UDOT videos document similar construction projects on I-80 which crosses the West Desert in Tooele County. Utah's heavy rainfall in the early 1980s caused the Great Salt Lake to rise to record levels. UDOT had to raise I-80 levees around the lake to keep water off the interstate.
Video footage in this collection documents the final phases ofconstruction on I-215, the belt route in Salt Lake City (1986-1987). It also documents extensive landscaping which UDOT completed on the belt route in the early 1990s. UDOT updated sections of I-15 in the Salt Lake City area (1986, 1992), and completed I-15 projects in Box Elder County, from Plymouth to Tremonton (1990), and in Washington and Iron Counties (1992). UDOT improvements on I-15 included construction of a super port of entry in St. George, Utah (1992).
In an attempt to improve the interstate, UDOT resurfaced a section of I-15 near Salt Lake City with a synthetic cement called syncrete (1989-1990). Syncrete proved to be less than the superior surface it was advertised to be, and the freeway surface began crumbling shortly after the project's completion. In the end the UDOT tore out the syncrete and admitted that the experiment had been a failure.
This series documents construction of major thoroughfares in Utah cities. West Valley Highway, renamed Bangerter Highway in1993, (1991) is a major north-south artery which runs the full length of Salt Lake Valley. Washington Boulevard (1992) is a similar artery in Ogden, Utah.
UDOT construction projects documented herein include a number of state roads. Most prominent of these are: State Road 31, through Huntington Canyon, State Road 9 which connects I-15 to U.S. 89 at Mt. Carmel Junction, State Road 313 which links Dead Horse Point with U.S. 191 near Seven Mile Canyon, State Road 276 in the area of Glen Canyon Recreation Area, and State Road 24 which links Salina to Hanksville via Capitol Reef National Park. Documented projects include construction of the San Rafael Bridge (1990) on State Road 24, and construction of a bridge across the Virgin River (1992) on State Road 9 in Washington County.
Video tapes in this series document the construction of a new Dewey Bridge to replace the original Dewey Bridge built in 1916 across the Colorado River near the confluence of the Colorado and Big Dolores Rivers.These video tapes also document the construction of the Jordanelle Dam which continued from 1987 to 1993. The Jordanelle Dam, which is on the Provo River about 10 miles north of Heber City and 40 miles east of Salt Lake City, created Jordanelle Reservoir.
In addition to video tapes documenting construction, this UDOT collection includes aerials of the Colorado River and the Salt Lake Valley, back country shots on the Big Dolores River, the dedication ceremony for the Recapture Wash Dam, shots of petroglyphs and archeological digs, shots of flooding (1986), and a compilation of nightly news reports on syncrete.
Gaps in Series
There are virtually no videos for the year 1987.
Research Note
Even though there are a few video tapes of earlier and later date, the bulk of documentation in this collection is 1985 to 1993.
Research Note
Even though there are a few video tapes of earlier and later date, the bulk of documentation in this collection is 1985 to 1993.
Access Restrictions
This series is designated as Public.
Reproduction and Use
These records are available for reproduction and use.
Related Records
Upper Colorado River project case files from the Governor Clyde, Series 200, may contain photo and/or video of construction projects related to the Upper Colorado River Storage Project.
Official photographs from the Department of Transportation. Office of Community Relations, Series 24289, contains additional documentation of all construction projects.
Official photographs index from the Department of Transportation. Office of Community Relations, Series 25122, provides reference and additional descriptive information about the videos in this series.
Indexing Terms
Transportation--Utah--Photograph collections
REEL | FOLDER | DESCRIPTION |
1 | 1 | Antelope Island borrow pit and conveyor, Aug 1979-Nov 1981 |
1 | 2 | Capitol Reef in rain and sand storm and launching John Atlantic Burr (no date) |
1 | 3 | Colorado River aerials, 14 April 1986 |
1 | 4 | Dewey Bridge construction, new structure over Colorado River, 5 Feb 1986 |
1 | 5 | Dewey Bridge, road Sisco to Dewey Bridge, road bridge to Moab, Clayhill pictographs, 28 Apr 1986. |
1 | 6 | Dewey Bridge construction, 21 May 1986 |
1 | 7 | Dewey Bridge, removal of barricades from old bridge, petroglyphs near Dewey, 12 Aug 1986 |
1 | 8 | Dewey Bridge construction, 15 Jul 1986, 16 Jul 1986, and 2 Sep 1986 |
1 | 9 | Flooding in Weber Canyon, 18 Feb 1986; Flooding Ogden Canyon, 20 Feb 1986; Flooding I-80 Great Salt Lake, 24 Feb 1986. |
1 | 10 | Indian digging in Huntington Canyon, 20 Oct 1986 & 4 Nov 1986. |
1 | 11 | Interstate-15 closing and preconstruction at 7200 South, 28 Jul 1986 |
1 | 12 | Interstate-15 at 7200 South, bridge deck repair, undated |
1 | 13 | Interstate-15 at 7200 South, bridge repair and shots of completed road, 15 Oct 1986 |
1 | 14 | Interstate-15 North of Beaver, 11 Sep 1986 |
1 | 15 | Interstate-15, Malad River to Plymouth, Sep 10 1985 |
1 | 16 | Interstate-15, Malad River (85-213). |
1 | 17 | Interstate-15, Malad River, Tremonton to Plymouth, 6 Jun 1986 |
1 | 18 | Interstate-15, Tremonton to Plymouth, north end of project, 7 Nov 1986, 13 Mar 1987 |
1 | 19 | Interstate-215 shoulder wall drilling, no date |
1 | 20 | Interstate-215 east of 11th East, 28 Aug 1986. |
2 | 1 | Interstate-215 general construction, day before dedication; 31 Jul 1985 & 3 Dec 1986. |
2 | 2 | Interstate-215, first beams of large structure being brought into place, 15-17 Dec 1986. |
2 | 3 | Interstate-215 construction; 7200 South and Murray, 11 Dec 1986; lifting last connecting beams over 20th East, 11 Jan 1987 |
2 | 4 | Interstate-215 east of 11th east; cement plant set up and laydown machine, 27 Feb 1987, 7 Jul 1987, 9 Jul 1987 |
2 | 5 | Interstate-215 rain on new pour, 11 Aug 1987 |
1 | 2 | Interstate-70 construction through Clear Creek Canyon, including shots of petroglyphs, no date |
1 | 15 | Interstate-70 Richfield South, Sep 16, 1985 |
2 | 6 | Interstate-70 over U.S. 89, 13 Mar 1986 to 12 Sep 1986 |
2 | 7 | Interstate-70 construction of overpass over U89 and general construction from Salina to Sigard, Mar 1986 |
2 | 8 | Interstate-70 archeological digs, 10 Apr 1986 |
1 | 5 | Interstate-70 over 89, I-70 to Salina; I-70 South of Richfield, 28 Apr 1986 |
2 | 9 | Interstate-70 South of Richfield construction, 28 May 1986 |
2 | 10 | Interstate-70 South of Richfield, 17 Jul 1986, 14 Aug 1986; I-70 crossing 89, 17 Jul 1986, 14 Aug 1986 |
1 | 7 | Interstate-70 asphalt laydown, Aug 1986 |
2 | 11 | Interstate-70 aerials of construction Salina to Elsinore, 13 Sep 1986 |
2 | 12 | Interstate-70 over U.S. 89; beginning of concrete pour West of Filmore, 15 Sep 1986 |
2 | 13 | Interstate-70 aerials North of Richfield, preconstruction, 29 Sep 1986 |
2 | 14 | Interstate-80 West, high water and erosion, I-80 at lake point before concrete laydown, 16 Apr 1986 |
2 | 15 | Interstate-80 West concrete overlay, Black Rock to 8 miles post Tooele Junction, deck repair, 13 Jun 1986, I-80 West, 18 Jun 1986 |
2 | 16 | Interstate-80 core sampling West, Wendover to Knolls, Nov 1986 |
1 | 17 | Mirror Lake Road (State Road 50) washout, 9 Jun 1986 |
2 | 17 | Parley's Canyon slide and road damage, plus repair, 10 Sep 1986, 18 Sep 1986, 26 Sep 1986 |
1 | 15 | Provo Canyon construction, Jul 10, 1985, Sep 9, 1985, Oct 29, 1985 |
2 | 18 | Provo Canyon, 12 Mar 1987, Thistle, 12 Mar 1987, Provo Canyon, 18 Mar 1987 |
2 | 19 | Provo Canyon, 8'pipe at wildwood, beginning of construction, 12 Mar 1987; Billies Mountain before big blast, 12 Mar 1987; Provo Canyon, large pipe, 18 Mar 1987. |
2 | 20 | Recapture Wash dedication ceremony, 1986 |
1 | 15 | Salt Lake Valley aerials and slag on Great Salt Lake beaches, Sep 12, 1985 |
3 | 1 | State Road 65, realignment for Little Dell Reservoir, 18 Apr 1987 |
3 | 2 | Trapper's Loop locations, undated |
3 | 3 | Trapper's Loop, three trips, undated |
3 | 4 | Utah Highway 276, Clayhill Pass construction, Part I, 11 Mar-29 Apr, 1986 |
3 | 5 | Utah Highway 276, Clayhill Pass construction, part II, 29 Apr to 14 Jul 1986. |
3 | 6 | Utah Highway 276, Clayhill Pass construction, part III, 14 Jul to 13 Sep 1986 |
3 | 7 | Utah Highway 276, Clayhill Pass, 13 Aug to13 Sep 1986. |
3 | 8 | Utah Highway 276, Clayhill documentation, 14 Jul 1986, 21 Oct 1986 |
3 | 9 | 87-003, West Desert pumping and dyking |
3 | 10 | 88-075, 88-076, I-215 construction |
3 | 11 | 88-079, 88-081, I-215 construction and Garfield interchange fatality |
3 | 12 | 88-080, 88-084, Garfield interchange |
3 | 13 | 88-082, I-80 Delle to Burmester |
3 | 14 | 88-083, I-80 Delle to Burmester |
3 | 15 | 88-085, Garfield interchange |
3 | 16 | 88-088, 88-089, Jordanelle |
3 | 17 | 88-090, Jordanelle, part 1 |
3 | 18 | 88-090, 88-091, Jordanelle, part 2 and Jordanelle night construction |
3 | 19 | 88-095, aerials Jordanelle |
3 | 20 | 88-108, 88-111, Jordanelle SW |
4 | 1 | 88-112, Jordanelle NE |
4 | 2 | 88-113, Jordanelle SW |
4 | 3 | 88-114, 88-118, 88-119, Jordanelle, SW and Henifer structure |
4 | 4 | 88-125, Jordanelle NE |
4 | 5 | 88-126, Jordanelle NW |
4 | 6 | 88-127, Jordanelle SW |
4 | 7 | 88-128, Jordanelle SW |
4 | 8 | 88-132, I-70 Fremont Junction to Muddy Creek |
4 | 9 | 88-132, I-70 Fremont Junction to Muddy Creek |
4 | 10 | 88-133, I-70 Devils Canyon to Ghost Rocks |
4 | 11 | 88-134, I-70 Ghost Rocks to Rattlesnake Bench |
4 | 12 | 89-003, U.S. 89 Wall Street and Riverdale Road |
4 | 13 | 89-005, I-215 |
4 | 14 | 89-018, State Road 14 slide area |
4 | 15 | 89-021, I-70 Devils Canyon to Ghost Rocks |
4 | 16 | 89-022, I-70 Ghost Rocks to Rattlesnake Bench |
4 | 17 | 89-020, 89-025, I-70 Fremont Junction to Muddy Creek and Devils Canyon |
4 | 18 | 89-020, 89-025, I-70 Fremont Junction to Muddy Creek and Devils Canyon |
4 | 19 | 89-025, I-70 Fremont Junction to Muddy Creek |
4 | 20 | 89-021, 89-026, Eagle Canyon structure |
5 | 1 | 89-029, 89-030, Jordanelle NE |
5 | 2 | 89-051, Jordanelle NW |
5 | 3 | 89-053, Jordanelle SW |
5 | 4 | 89-054, Jordanelle SW |
5 | 5 | 89-055, Jordanelle SW |
5 | 6 | 89-057, Jordanelle NE |
5 | 7 | 89-059, 89-060, I-70 Sigard to Richfield and State Road 14 |
5 | 8 | 89-061, State Road 24 and San Rafael River Bridge |
5 | 9 | 89-062, I-70 Rattlesnake to Ghost Rocks |
5 | 10 | 89-063, I-70 Eagle Canyon structure |
5 | 11 | 89-065, 89-066, I-70 Ghost Rocks to Devils Canyon |
5 | 12 | 89-068, I-70 Fremont Junction to Muddy Creek |
5 | 13 | 89-070, U.S. 40 to Dead Man's Gulch |
5 | 14 | 89-073, 89-073, I-215 |
5 | 15 | 89-074, Jordanelle NE |
5 | 16 | 89-078, I-70 Richfield to Sigard |
5 | 17 | 89-079, I-70 Muddy River to Fremont |
5 | 18 | 89-080, I-70 Eagle Canyon |
5 | 19 | 89-081, I-70 Rattlesnake to Ghost Rocks |
5 | 20 | 89-086, I-15 concrete slurry |
6 | 1 | 89-086, I-15 concrete slurry rehabilitation |
6 | 2 | 89-088, I-15 concrete slurry |
6 | 3 | 89-089, I-15 concrete slurry (preparing lanes for syncrete application) |
6 | 4 | 89-091, I-15 syncrete laydown |
6 | 5 | 89-092, I-15 syncrete |
6 | 6 | 89-093, I-15 concrete slurry rehabilitation |
6 | 7 | 89-094, I-15 syncrete laydown |
6 | 8 | 89-095, syncrete laydown |
6 | 9 | 89-096, syncrete laydown machine |
6 | 10 | 89-097, lane being prepared for syncrete laydown |
6 | 11 | 89-098, modified and reassembled syncrete laydown paving machine |
6 | 12 | 89-099, syncrete problems and making modifications |
6 | 13 | 89-100, syncrete |
6 | 14 | 89-101, 89-102, syncrete |
6 | 15 | 89-103, 89-104, syncrete, Ideal Cement Co. plant mixing special syncrete mix |
6 | 16 | 89-105, syncrete damage, patching and rutting |
6 | 17 | 89-106, syncrete laydown |
6 | 18 | 89-107, Trappers Loop |
6 | 19 | 89-108, bonding factors in syncrete, part 1 |
6 | 20 | 89-108, bonding factors in syncrete, part 2 |
7 | 1 | 89-109, I-15 syncrete, run through entire project |
7 | 2 | 89-110, I-15 syncrete, breaking and clearing off outside lane |
7 | 3 | 89-112, 89-115, I-15 syncrete, all three lanes |
7 | 4 | 89-116, I-15 syncrete, continued problems |
7 | 5 | 89-117, I-15 syncrete, Union Pacific Resources |
7 | 6 | 89-119, seibulite |
7 | 7 | 89-121, Risk management, Lupe Tavarez home |
7 | 8 | 89-122, Risk management, Richard Ross home |
7 | 9 | 89-123, Risk management, Steve Herrara home |
7 | 10 | 89-124, Risk management, Harold T. Olsen home |
7 | 11 | 89-125, Risk management, Mrs. Kooyman home |
7 | 12 | 89-126, Risk management, Edward T. Price home |
7 | 13 | 89-127, Risk management, Dean Collins home |
7 | 14 | 89-128, Risk management, Norma Vance home |
7 | 15 | 89-129, 89-130, Risk management, LeRoy T. Parkin & Arden Lubeck homes |
7 | 16 | 89-132, Syncrete test section |
7 | 17 | 89-133, Risk management, Ethel Hansen home |
7 | 18 | 90-001, Risk management, Ron Brummer home |
7 | 19 | 90-002, Risk management, Ron Brummer duplex |
7 | 20 | 90-003, Risk management, Johanna Atkinson home |
8 | 1 | 90-004, syncrete, closure of inside lane |
8 | 2 | 90-005, syncrete, closing lanes for tests |
8 | 3 | 90-006, syncrete video (compiled from previous videos) |
8 | 4 | 90-007, TV news clips about syncrete |
8 | 5 | 90-011, syncrete removal |
8 | 6 | 90-013, syncrete removal plus settling ponds |
8 | 7 | 90-014, I-215 and Big Cottonwood diagonal |
8 | 8 | 90-016, Jordanelle NE |
8 | 9 | 90-017, I-15 Wildcat to Millard County line |
8 | 10 | 90-018, I-70 Fremont Junction to Muddy River, part 1 |
8 | 11 | 90-018, I-70 Fremont Junction to Muddy River, part 2 |
8 | 12 | 90-019, I-70 Devils Canyon to Ghost Rocks |
8 | 13 | 90-020, I-70 Devils Canyon to Ghost Rocks |
8 | 14 | 90-021, I-70 Eagle Canyon structure |
8 | 15 | 90-022, 90-023, State Road 313 Island in the Sky to Dubinky and Dubinky to U.S. 191 |
8 | 16 | 90-024, I-70 Fremont Junction to Muddy River |
8 | 17 | 90-028, Jordanelle NE |
8 | 18 | 90-029, I-215 noise wall |
8 | 19 | 90-030, syncrete all ground off and textured |
8 | 20 | 90-031, Hilltop to Utah County line |
9 | 1 | 90-031, I-15 Tremonton to Plymouth |
9 | 2 | 90-032, I-15 Salt Creek Interchange, Nephi |
9 | 3 | 90-033, State Road 21 Nevada line to Cedar Pass |
9 | 4 | 90-034, I-15 Wildcat to Millard County line |
9 | 5 | 90-035, I-15 Tremonton to Plymouth |
9 | 6 | 90-036, Jordanelle NE |
9 | 7 | 90-037, I-80 Navajo to I-15 |
9 | 8 | 90-038, I-80 structures, Redwood Road to I-15 |
9 | 9 | 90-039, Califronia Avenue and Redwood Road |
9 | 10 | 90-040, State Road 313 Dubinky Road to U.S. 191, part 1 |
9 | 11 | 90-040, State Road 313 Dubinky Road to U.S. 191, part 2 |
9 | 12 | 90-041, State Rod 313 Island in the Sky to Dubinky Road |
9 | 13 | 90-042, I-15 Wildcat to Millard County line |
9 | 14 | 90-043, I-70 Eagle Canyon structure |
9 | 15 | 90-044, I-70 Ghost Rocks to Devils Canyon |
9 | 16 | 90-045, I-15 Salt Creek Interchange, Nephi |
9 | 17 | 90-046, 5400 South |
9 | 18 | 90-047, Foothill Boulevard to Sunnyside Avenue |
9 | 19 | 90-049, flash flood damage I-15 Plymouth to Tremonton |
9 | 20 | 90-050, State Road 313 Dubinky Road to U.S. 191 |
10 | 1 | 90-051, State Road 313 |
10 | 2 | 90-052, 90-053, I-70 Ghost Rocks to Devils Canyon, Eagle Canyon |
10 | 3 | 90-058, U.S. 40 Starvation to Tabby Junction |
10 | 4 | 90-060, I-15 Tremonton to Plymouth |
10 | 5 | 90-062, Foothill Drive to Sunnyside Avenue |
10 | 6 | 90-063, West Valley Highway |
10 | 7 | 90-064, I-80 structures Salt Lake City |
10 | 8 | 90-065, I-15 Tremonton to Plymouth |
10 | 9 | 90-066, I-15 Tremonton to Plymouth |
10 | 10 | 90-067, I-15 St. George super port |
10 | 11 | 90-068, I-70 Saleratus Wash to Green River |
10 | 12 | 90-069, San Rafael River Bridge |
10 | 13 | 90-071, I-15 Tremonton to Plymouth |
10 | 14 | 90-072, I-15 Tremonton to Plymouth |
10 | 15 | 90-073, I-15 Tremonton to Plymouth |
10 | 16 | 90-075, I-15 Tremonton to Plymouth |
10 | 17 | 90-078, State Road 92, American Fork Canyon |
10 | 18 | 90-080, U.S. 189 Park City Junction to Browns Canyon |
10 | 20 | 90-081, I-70 Saleratus Wash to Green River, part 1 |
11 | 1 | 90-081, I-70 Saleratus Wash to Green River, part 2 |
11 | 2 | 90-082, I-15 St. George super port |
11 | 3 | 90-083, San Rafael River Bridge |
11 | 4 | 90-084, American Fork Canyon |
11 | 5 | 90-085, I-80 and 7200 West structure repair |
11 | 6 | 90-086, I-80 Knolls to Low |
11 | 7 | 90-087, U.S. 191 Park City Jct to Brown's Canyon |
11 | 8 | 90-088, I-80 and 7200 West damaged structure repair |
11 | 9 | 90-091, 7200 West and I-80 Knolls to Low |
11 | 10 | 90-092, West Valley Highway |
11 | 11 | 90-093, 7200 West and I-80 |
11 | 12 | 90-094, I-15 St. George super port |
11 | 13 | 90-095, San Rafael River Bridge |
11 | 14 | 91-001, hydro-blasting |
11 | 15 | 91-002, 7200 West and I-80 structure damage repair |
11 | 16 | 91-003, 7200 West and I-80 |
11 | 17 | 91-004, 7200 West and I-80 structure repair |
11 | 18 | 91-005, San Rafael River Bridge |
11 | 19 | 91-006, State Road 313 U.S. 191 to Dubinky and Dubinky to Island in the Sky |
11 | 20 | 91-009, St. George super port |
12 | 1 | 91-010, Ash Creek structures Toquerville |
12 | 2 | 91-011, San Rafael River structure |
12 | 3 | 91-022, 9400 South and 13th East intersection |
12 | 4 | 91-024, Jordanelle NE |
12 | 5 | 91-027, Castle Gate slope repair |
12 | 6 | 91-029, Jordanelle North |
12 | 7 | 91-031, Jordanelle West |
12 | 8 | 91-032, I-80 Knolls to Low |
12 | 9 | 91-033, Lemon's Dugway |
12 | 10 | 91-034, West Valley Highway |
12 | 11 | 91-035, West Valley Highway |
12 | 12 | 91-036, American Fork Canyon Road |
12 | 13 | 91-037, West Valley Highway |
12 | 14 | 91-038, West Valley Highway |
12 | 15 | 91-042, Jordanelle West |
12 | 16 | 91-043, Jordanelle East |
12 | 17 | 91-050, Lemon's Dugway |
12 | 18 | 91-053, Eagle Canyon structures from bottom of Eagle Canyon |
12 | 19 | 91-080, I-215 landscaping |
12 | 20 | 91-081, I-215 landscaping |
13 | 1 | 91-087, Washington Boulevard, Ogden |
13 | 2 | 91-095, Jordanelle West |
13 | 3 | 91-105, Washington Boulevard, Ogden |
13 | 4 | 91-106, Lemon's Dugway |
13 | 5 | 91-109, US 6 West Price to East Price |
13 | 6 | 91-112, 91-113, 91-114, 91-115, St. George super port, I-15 resurfacing in Washington County, Coal Creek Structure, and State Road 14 slide area |
13 | 7 | 91-116, West Valley Highway |
13 | 8 | 91-117, West Valley Highway |
13 | 9 | 91-118, West Valley Highway |
13 | 10 | 91-119, Black Rock Interchange |
13 | 11 | 91-120, Jordanelle West |
13 | 12 | 91-121, West Valley Highway |
13 | 13 | 91-122, 91-123, 91-124, I-15 Provo to Spanish Fork, Soldier Summit, and Castle Gate slope repair |
13 | 14 | 91-127, Provo Canyon |
13 | 15 | 91-128, Provo Canyon |
13 | 16 | 91-135, Provo Canyon |
13 | 17 | 91-136, I-215 landscaping |
13 | 18 | 91-137, Provo Canyon |
13 | 19 | 91-139, West Valley Highway |
13 | 20 | 91-140, Black Rock Interchange |
14 | 1 | 91-144, I-215 landscaping |
14 | 2 | 91-145, Washington Boulevard, Ogden |
14 | 3 | 91-146, Jordanelle North |
14 | 4 | 91-147, Lemon's Dugway |
14 | 5 | 91-148, Provo Canyon |
14 | 6 | 91-149, Provo Canyon |
14 | 7 | 92-004, I-215 landscaping |
14 | 8 | 92-005, State Street structure across I-15 |
14 | 9 | 92-006, I-15 and State Street structure |
14 | 10 | 92-007, I-15 and State Street structure |
14 | 11 | 92-008, I-215 landscaping |
14 | 12 | 92-032, 92-033, Provo Canyon |
14 | 13 | 92-034, 92-035, I-15 and State Street, I-215 landscaping |
14 | 14 | 92-037, 92-039, 92-040, Washington Boulevard, Ogden, Ogden River Bridge |
14 | 15 | 92-038, I-215 landscaping, part 1 |
14 | 16 | 92-038, I-215 landscaping, part 2 |
14 | 17 | 92-041, I-215 landscaping |
14 | 18 | 92-042, Washington Boulevard, Ogden River Structure |
14 | 19 | 92-044, Washington Boulevard and demolition of Provo River Structure |
14 | 20 | 92-050, Washington Boulevard, Odgen |
15 | 1 | 92-054, U.S. 89 Thistle |
15 | 2 | 92-055, 92-056, State Road 31 Huntington Canyon |
15 | 3 | 92-057, U.S. 191 Shirtail to Recapture Wash Dam |
15 | 4 | 92-058, I-70 night shots, part 1 |
15 | 5 | 92-058, I-70 day shots, part 2 |
15 | 6 | 92-059, I-15 Cedar City to Hamilton Fort, part 1 |
15 | 7 | 92-059, I-15 Cedar City to Hamilton Fort, part 2 |
15 | 8 | 92-061, Virgin River Bridge construction at Quail Creek |
15 | 9 | 92-062, 92-063, St. George super port and interchange |
15 | 10 | 92-064, U. 12 Dalton to Grafton |
15 | 11 | 92-065, Washington Bouldvard River Structure |
15 | 12 | 92-066, Washington Boulevard, Ogden |
15 | 13 | 92-068, Provo Canyon |
15 | 14 | 92-069, 92-070, West Valley Highway |
15 | 15 | 92-071, West Valley Highway |
15 | 16 | 92-072, 92-073, Black Rock Interchange and I-80 Tooele area |
15 | 17 | 92-073, 92-074, State Road 31 Huntington Canyon |
15 | 18 | 92-075, I-70 Rattlesnake Bench to San Rafael River, Spotted Wolf Canyon |
15 | 19 | 92-077, U.S. 191 Recapture Dam to Shirtail Junction |
15 | 20 | 92-079, State Road 12 Dalton to Grafton |
16 | 1 | 92-080, State Road 9 Virgin River structure Quail Creek |
16 | 2 | 92-081, I-15 Cedar City to Hamilton Fort |
16 | 3 | 92-082, U.S. 89 Ephriam Main Street |
16 | 4 | 92-086, State Road 136 Vernon to Juab County line |
16 | 5 | 92-089, I-80 Tooele interchange to Burmester |
16 | 6 | 92-092, 92-093, Washington Boulevard and Odgen River Bridge |
16 | 7 | 92-094, State Road 36 Vernon to Juab County line |
16 | 8 | 92-095, Provo Canyon |
16 | 9 | 92-099, State Road 31 Fish Creek to forest boundary |
16 | 10 | 92-100, State Road 31 Fish Creek to Huntington |
16 | 11 | 92-101, U.S. 191 Recapture to Shirtail Junction |
16 | 12 | 92-102, I-70 Rattlesnake Bench to Saleratus Wash |
16 | 13 | 92-104, State Road 9 Virgin River Bridge at Quail Creek |
16 | 14 | 92-108, West Valley Highway |
16 | 15 | 92-113, 92-115, State Road 36 Vernon to Juab County line |
16 | 16 | 92-119, U.S. 89 Ephriam Main Street |
16 | 17 | 92-120, 92-121, State Road 31 Huntington Canyon |
16 | 18 | 92-123, 92-124, State Road 31 Huntington Canyon |
16 | 19 | 92-125, State Road 14 slide area |
16 | 20 | 92-127, Virgin River structure |
17 | 1 | 92-128, Sate Road 9 Dalton Wash to Grafton |
17 | 2 | 92-144, Washington Boulevard, Ogden |
17 | 3 | 92-145, State Road 31 Huntington Canyon |
17 | 4 | 92-146, State Road 31 Huntington Canyon |
17 | 5 | 92-148, I-70 Rattlesnake Bench to Saleratus Wash |
17 | 6 | 92-149, State Road 14 blasting |
17 | 7 | 92-150, State Road 9 Virgin River structure at Quail Creek |
17 | 8 | 92-151, State Road 9 Dalton Wash to Grafton |
17 | 9 | 92-156, D-Road Presentation, tape 1-A |
17 | 10 | 92-156, D-Road Presentation, tape 2-A |
17 | 11 | 92-156, D-Road Presentation, tape 1-B |
17 | 12 | 92-156, D-Road Presentation, tape 2-B |
17 | 13 | 93-016, I-215 landscaping |
17 | 14 | 93-020, I-215 landscaping, part A |
17 | 15 | 93-020, I-215 landscaping, part B |
17 | 16 | 93-021, I-215 landscaping |
17 | 17 | 93-027, I-215 landscaping |
17 | 18 | 93-030, State Road 31 Fish Creek to forest boundary |
17 | 19 | 93-039, State Road 31 Huntington Canyon |
17 | 20 | 93-133, I-215 landscaping, part 1 |
18 | 1 | 93-133, I-215 landscaping, part 2 |
18 | 2 | 95-093, State Road 36 |
18 | 3 | 95-101, Big Dolores River trip |
19-34 | N/A | unevaluated reel to reel tapes |